The Boys Have Arrived!

The boys have arrived and we have started laying the flooring.

Continual rain though is drastically slowing progress.

In between the rains we glued and nailed the sheeting down.

Progress is slow though as we have to keep covering the beams and sheets with tarps.

Unfortunately rain is predicated for a large part of the week.

By the end of day we were nearly half way.