All Covered Up
With two exterior walls successfully painted we moved onto painting the walls surrounding the deck. With only two short walls and […]
With two exterior walls successfully painted we moved onto painting the walls surrounding the deck. With only two short walls and […]
Inspired by the successful outcome of the painting of the end verandah we decided to continue on our painting roll, and
With the decking completed on the end verandah we no longer had any impediments to painting the eaves and wall on the northside.
Every night last week, until all hours PC has been tinkering in the shed, welding, grinding and painting. His latest
Following our decking success and keeping the momentum flowing we began laying the end verandah last Monday (Public Holiday). It was wet, windy
Seven months ago in November we began work on the foundations of our deck. The deck unites the ‘two houses’ together, it
PC has been rather frustrated with the continual rain as it has hindered progress on deck building. So we have turned
When we realised we needed to dig 40metres of trenches for piping; storm water and sewage, hiring a digger was
Never one to choose ease and speed over the final result, when we decided to ‘lift’ the eave height on
A couple of weeks ago we were most excited to take delivery of two new tanks. 5000UK gallons (22500 litres) each!